Resources / Articles
Planning notes for modular spray booths
A numbered index of StelBooth guidance for custom requirements, modules, equipment, maintenance, site preparation and assembly.
5 articles01–05
- 01 What to share before a custom spray-booth layout beginsPrepare a useful custom spray-booth brief with the workpiece, site, process, supply scope, destination and support expectations you already know.
- 02 How a modular booth is divided for shipping and local assemblyPlan modular spray-booth divisions around the assembly sequence, delivery route, connection map, packing logic and responsibilities at the destination.
- 03 Which equipment belongs in one coordinated supply packageDefine which fans, filters, lighting, controls and related generic equipment should be selected and supplied with a custom modular booth project.
- 04 Filter access, door swing, and maintenance clearance in a modular spray boothPlan filter removal, door swing, tool approach, working position and service routes before a custom modular spray-booth layout is released.
- 05 Site utilities and interface responsibilities before modular booth assemblyDefine site datums, foundations, electrical and duct boundaries, utility terminations, assembly access, local work and readiness evidence before modular booth delivery.
No matching articles.
1 / 1